G741S: Change Order for Design-Build Projects - Subcontractor Version

Endorsed By:

AIA
CMAA
AGC
CFMA
DBIA
Trustpilot 5-star rating

AIA Documents Used On

200,000+

Projects Per Year

$59.99

One-Time Use

Quantity

What Our Clients Are Saying

Tom Donaghy — KGD Architecture

Tom Donaghy, Principal

KGD Architecture

“Our clients are familiar with AIA Contract Documents and respect the fact that we use them. That common ground provides the momentum that fuels both sides throughout the project.”

Christy Blumefield — Blume Architecture

Christy Blumefield, President

Blume Architecture

“AIA Contract Documents have been a constant in the journey of my firm. They’re dependable, reliable, and provide a measure of credibility that’s unmatched.”

Tom Donaghy — KGD Architecture

Tom Donaghy, Principal

KGD Architecture

“Our clients are familiar with AIA Contract Documents and respect the fact that we use them. That common ground provides the momentum that fuels both sides throughout the project.”

Related Documents

The G741S: Change Order for Design-Build Projects - Subcontractor Version works best with these coordinated documents – use them together for the best results

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.

bg banner test

Related Articles

Construction Basics for Owners: The Design-Bid-Build and Design-Build Delivery Methods

Compares Design-Bid-Build and Design-Build delivery methods, outlining key differences for project owners.