A101 SCOSE: Owner and Contractor Agreement - Stipulated Sum (South Carolina Version)

Endorsed By:

AIA
CMAA
AGC
CFMA
DBIA
Trustpilot 5-star rating

AIA Documents Used On

200,000+

Projects Per Year

Frequently Bought Together:

G903AZ: Lien Waiver Form - Conditional Waiver on Final Payment (Arizona Version)

Arizona Version - Conditional Waiver and Release on Final Payment

$59.99

G742GMP: Payment Application and Certificate - Cost of Work, Design-Build with a Guaranteed Maximum Price

Application and Certificate for Payment for Cost of the Work Design-Build Projects with a Guaranteed Maximum Price

$59.99

C101: Joint Venture Agreement for Professional Services

Joint Venture Agreement for Professional Services

$179.99

$179.99

One-Time Use

Quantity

What Our Clients Are Saying

Tom Donaghy — KGD Architecture

Tom Donaghy, Principal

KGD Architecture

“Our clients are familiar with AIA Contract Documents and respect the fact that we use them. That common ground provides the momentum that fuels both sides throughout the project.”

Christy Blumefield — Blume Architecture

Christy Blumefield, President

Blume Architecture

“AIA Contract Documents have been a constant in the journey of my firm. They’re dependable, reliable, and provide a measure of credibility that’s unmatched.”

Tom Donaghy — KGD Architecture

Tom Donaghy, Principal

KGD Architecture

“Our clients are familiar with AIA Contract Documents and respect the fact that we use them. That common ground provides the momentum that fuels both sides throughout the project.”

Unlock Unlimited Access & Save $$

Stop paying per document—get unlimited use of 300+ industry-trusted AIA documents for one flat annual fee.

bg banner test

Related Articles

Design-Build vs Design-Bid-Build: Key Differences, Benefits, and Contract Frameworks

Compares design-build and design-bid-build project delivery methods, highlighting key differences and implications for stakeholders.

Building Data Centers: Cost and Risk Management Strategies During and Post-Construction

Provides strategies for managing costs and risks during and after the construction of data centers.

A101-2017 Comparative South Carolina Office of State Engineer (SCOSE)

Analyzes differences between A101-2017 and South Carolina's Office of State Engineer's version, highlighting key changes.